Construction of a photovoltaic plant, with an electrical output of 1 MW, in the municipality of Serrapetrona (MC)
The plant is located on the hillside to the east of the municipality of Serrapetrona (MC) on 100 Via Colli. It is composed of fixed modules on the ground for a total rated output of approximately 1 Mw. From a geomorphologic point of view, the area in question is characterized by a very steep slope, but this means that it is particularly suited to the exploitation of solar radiation due to the excellent exposure.
Ingenium was responsible for the design, completion of the documentation throughout the entire approval process and construction of the plant, performing the following services:
Building documentation Deposito strutture to the Civil Engineers
Geological report and seismic survey
Safety coordination in the building stage
Management of Works